UKSH Schleswig-Holstein Campus Kiel

  • Building 518 Surgery and Operation Centre
  • HKLS - Medical Gases - Fire Fighting Technology - ET - MSR
  • Comprehensive refurbishment
  • Energy efficient refurbishment

The surgery and operating centre in building 518 has been renovated and modernised with medical technology. This has resulted in additional operating areas as well as office and teaching rooms. Furthermore, the building's energy efficiency has been optimised and it has been equipped with photovoltaic systems.

UKSH Schleswig-Holstein Campus Kiel

The project

On the Kiel Campus of the University Hospital Schleswig-Holstein (UKSH), the Surgery and Operating Centre in Building 518 has undergone comprehensive renovation and medical-technical modernisation. Additional operating and procedure rooms have been created, and new examination equipment, such as MRI, CT, and X-ray systems, has been integrated. Furthermore, office, teaching, and lounge areas have been established to support clinical operations, administration, and training.

As part of the measures, the 1970s building was also renovated to improve its energy efficiency. In addition to improving the building envelope, photovoltaic systems were installed on the roof and facade surfaces.

Service phases

  • Revision of third-party planning draft LPH 3
  • Approval planning LPH 4
  • Implementation planning LPH 5
  • Preparation of the award of LPH 6
  • Participation in the award of LPH 7

Key Data for Renovation

  • 35,000 m² GFA building area
  • 3.5MW heating system
  • Refrigeration and cooling system 2.4MW
  • Heat recovery systems ~1.2MW
  • Air volume ~150,000 m³/h
  • Cleanroom ventilation technology and operating theatre ventilation systems
  • Electrical connection rating 2.7MW
  • Dynamic UPS System 490kVA
  • Integration of new systems into existing systems
  • Renovation and refurbishment measures during ongoing hospital operations

Key data of the energy refurbishment

  • Intelligent shading and sun protection
  • Photovoltaic system roof ~200kWp
  • Photovoltaic system facade ~40kWp
  • Optimisation of heating systems
  • Renovation and refurbishment measures during ongoing hospital operations

Further projects from our portfolio

Österreichisches Parlament
Austrian Parliament
  • Renovation
  • Modernisation
  • HKLS - ET - MSR

The historic parliament building has been modernised technically and functionally, while respecting heritage protection and complying with current standards.

Volksschule und Kindergarten Anton-Langer-Gasse
Primary school and kindergarten Anton-Langer-Gasse
  • Renovation
  • Extension
  • W+M Planning
  • HVAC

In Vienna's 13th district, an existing building housing a primary school and kindergarten was extended. The main focus of the work was on the production and assembly planning.